This is a staging setup for the Huawei switch device V600 OS-based (Taishan OS) before being added to the NCE Campus Controller. First, we configure the Netconf feature in the switch (for connection to the NCE Controller). Then, we set the source interface for this Netconf connection type to the NCE controller. In this case, […]

